Home/ Industries/ Industrial Plants & Heavy Industry
Controlled Preparation Systems

Industrial Plants & Heavy Industry

In heavy industry there's little tolerance for coating failure. Our Controlled Preparation Systems enforce process control, cleaning and profiling steel in-service to a documented, traceable standard while operations continue.

Operational excellence

The industrial challenge

Industrial plants operate under constant pressure: uptime targets, safety requirements, and harsh operating conditions. Corrosion and coating failure don't just affect assets, they affect production, safety, and cost control.

“Over 83% of coating failures start at the surface. In heavy industry, that risk is unacceptable.”

Heat & chemicals

Exposure to extreme temperatures, aggressive chemicals, and corrosive atmospheres.

Wear & vibration

Constant mechanical stress and structural vibration affecting coating integrity.

Restricted access

Limited maneuverability in confined spaces and complex plant layouts.

Uptime pressure

Ongoing operations with minimal windows for maintenance or shutdowns.

Process control where it matters

Preventive maintenance strategy

Many industrial maintenance programs focus on repairing coating failures after they occur. MontiPower supports a preventive surface preparation strategy, enabling steel surfaces to be prepared correctly even while plants remain operational.

Bristle blasting vs conventional blasting
Bristle blasting vs conventional blasting
Heavy industry maintenanceWeld preparationCorrosion in plant conditions
Targeted solutions

Critical plant areas

Structural steel & supports

Create a controlled, homogeneous surface profile to support long-term coating adhesion under continuous load and vibration.

Piping & process equipment

Prepare steel surfaces reliably on complex geometries without damaging the substrate or contaminating surrounding systems.

Confined & operational zones

Enable safe, controlled surface preparation with reduced dust and waste, ideal for maintenance inside active plants.

Repair & recoating

Remove corrosion and old coatings while preserving the integrity of existing assets during maintenance cycles.

Why MontiPower

Industrial benefits

Grit-free quality

Surface quality comparable to abrasive blasting, without the risk of grit contamination.

Reliable adhesion

Consistent surface profile for reliable coating adhesion on critical assets.

Reduced contamination

Minimal dust and waste, ideal for operational environments and sensitive systems.

Improved HSE

Better health, safety, and environmental conditions for maintenance crews.

Shorter shutdowns

Simplified logistics and faster preparation times to minimize downtime.

Proven performance

Reliable results across the most demanding heavy industrial sectors.

Do it right.
Do it once.
With ease.

Industrial Plants & Heavy Industry field application
Proven in the field

Trusted on projects worldwide

Well suited to maintenance and inspection in oil, gas and petrochemical plants, including certified hazardous-area work. No hazardous materials, minimal dust, and no need for blast containment or grit disposal.

Petrochemical processorsChemical manufacturersRefinery operatorsOil & gas majors
Certified for explosive atmospheres

Certified for explosive atmospheres.

The Bristle Blaster® Pneumatic Ultimate has undergone an independent ignition-hazard analysis and ATEX 2014/34/EU conformity evaluation, so surface preparation can continue in live hazardous areas without hot-work permits for electric tools.

◎ Ex
II 2G Ex h IIA Gb · II 2D Ex h IIIC Db
Category 2, zone 1 gas & zone 21 dust

Zone 1 explosive gas, assessed for gas group IIA (petrol, hexane, propane), EPL Gb.

Zone 21 explosive dust, assessed for dust subgroup IIIC, EPL Db.

Fully pneumatic, compressed-air drive, no electrical components, no electrical ignition source.

Independently evaluated by Gexcon to the harmonized EN ISO 80079 series.

EN ISO 80079-36:2016 EN ISO 80079-37:2016 IEC 60079-0 ATEX 2014/34/EU
ATEX certified Bristle Blaster® Pneumatic Ultimate
Equipment group / categoryII 2G & II 2D
Gas atmosphereZone 1 · IIA · EPL Gb
Dust atmosphereZone 21 · IIIC · EPL Db
DrivePneumatic, no electrics
Types of protectionConstructional safety “c” · ignition control “b”
EvaluationGexcon IHA · rev 02 · 2026
Independently verified by physical testing at Gexcon
EN 80079-36 Annex DZero electrostatic discharge

Brush-discharge testing recorded no measurable discharge — passed for gas groups IIA, IIB and IIC.

ISO 80079-36 · IEC 60079-0Drop-tested, safety retained

Eight drops in ambient and frozen condition — no damage that reduces the tool’s ignition safety.

ATEX 2014/34/EUNo ignition in live gas clouds

Operated inside explosive propane-air atmospheres (group IIA) with no ignition observed.

Markings shown reflect the scope of the independent ATEX conformity evaluation. Confirm the certified marking on the tool nameplate and Declaration of Conformity for your specific configuration before specifying.

References
BASFEnbridgeConocoPhillipsDowEnBWCarbolineKansai PaintBelzonaSherwin-WilliamsChestertonHempelCanusa-CPSStopaqInternational PaintAkzoNobelPPGLoctiteProtegol (TIB Chemicals)AllterPolykenZingaCovalence3X EngineeringJotunChugoku Marine Paints
Trusted by industrial professionals

Trusted by operators, maintenance teams and contractors

With decades of experience and patented technology, MontiPower supports operators, maintenance teams, and contractors working in demanding industrial environments. Our solutions fit cleanly into existing maintenance programs and coating specifications, supporting safety, consistency, and long-term asset protection.