Case Study

MontiPower in Action — Peru, ready for coating - No. 3

July 09, 2026By MontiPower1 min de lecture
En bref

In this Peak Times Moments, we visit Peru once more. MontiPower® is involved in several projects in this beautiful country. Our first edition described a MontiPower® training session in Piura, Peru. This time we will t

In this MontiPower in Action, we visit Peru once more. MontiPower® is involved in several projects in this beautiful country.

Our first edition described a MontiPower® training session in Piura, Peru. This time we will travel to the southeast of Peru, the Andes to be exact, at 4,100 m above sea level. Our Monti systems are in use here at the ‘Mina Constancia’ mines, at a pit with an even nicer name, ‘Pampacancha’.

SEPCON, the facility’s registered contractor, is an international company active in Peru, Bolivia and Argentina, with a focus on EPC projects for the Gas and Oil, Mining and Energy industries. The company prioritises the execution of all projects in accordance with ISO 9001, ISO 14001 and OHSAS 18001 international standards throughout the process chain.

MontiPower® holds the same views regarding quality and environment and is proud to be contributing to such a special project, in a very special area of our planet!

Read the full moment (PDF) ↓

Read this edition as PDF ↓ All Peak Times moments

Have a job like this?

Parlez-nous de votre surface.
We'll recommend the method.

Get a specific recommendation for your substrate, coating and standard, not a generic brochure.